From the file

What a catastrophe bulletin actually is (and why it goes out the next morning)

Mammatus clouds hanging low over a suburban area at twilight after a storm.

If you've worked a CAT desk through even one season, you've seen the term thrown around in the first all-hands call after a storm: "bulletin's going out by six." Adjusters new to catastrophe work sometimes assume it's a weather report with a company letterhead. It isn't. A catastrophe bulletin, or CAT bulletin, is the internal document that tells everyone downstream where the damage sits, roughly how bad it is, and in what order the claims queue should get worked.

Think of it as a dispatch order more than a forecast. The National Weather Service tells you a storm tracked through three counties with golf-ball hail near the eye and quarter-size at the edges. The bulletin takes that and answers the question your adjusters actually need answered: which addresses on our book sit inside that swath, and which of those look bad enough to jump the line.

What's actually in one

A bulletin built the morning after an event usually has a few things in common, whether it's typed up by a CAT team analyst or assembled from a vendor feed:

  • A defined swath or footprint, drawn from storm track data, radar-derived hail size, or wind gust estimates
  • A list or map overlay of insured addresses that fall inside that footprint
  • A severity sort, usually just a few tiers: total, moderate, minor exposure
  • A number. Every CAT event gets one, and every bulletin tied to it gets a sequence, so "Bulletin 3 for Event 2026-014" means something specific to everyone who reads it, from the desk adjuster in Columbus to the TPA fielding overflow claims in Tulsa

That numbering matters more than it sounds like it should. When a hailstorm runs across four counties and generates nine thousand FNOLs in two days, "the bulletin" stops being useful as a phrase. You need Bulletin 1 (initial footprint, issued off NWS storm reports), Bulletin 2 (updated footprint once ground truth starts coming back from the first wave of adjusters), and so on. A numbered claims memo lets a manager say "that address wasn't in Bulletin 1's swath, check Bulletin 4" without anyone having to dig through an email thread to figure out which version they're even looking at.

Why the morning-after timing isn't optional

A bulletin that lands three days after the storm does a lot less for you than one that lands the next morning. The reason has nothing to do with urgency for its own sake. It's about where adjusters get sent first.

Every CAT claims operation has a finite number of boots that can hit the ground in week one. Send them in storm-chronology order, or by whoever called first, and you'll have a crew re-roofing a cracked soffit on day two while a torn-off roof two streets over sits open to weather for a week, racking up secondary water damage that becomes its own claim. The bulletin exists to front-load that decision. It's the thing a CAT manager points to when deciding that the forty addresses with confirmed missing shingles and exposed decking go out Monday morning, and the ones flagged for minor cosmetic hail wait till Thursday.

That's also why the severity sort inside the bulletin matters as much as the footprint itself. A swath map tells you where the storm went. It doesn't tell you which of the six hundred addresses inside that swath lost a ridge cap and which ones have a few bruised shingles that'll survive a long wait.

Where the detail actually comes from

Bulletins have historically leaned on whatever ground truth exists in the first twelve hours: storm reports, a handful of early adjuster photos, sometimes nothing more than the radar hail-size overlay. That's workable for drawing the swath. It's thinner for the address-by-address severity call that's supposed to drive dispatch order.

Hail & Wind Damage runs post-event aerial imagery across the swath and flags bruising, missing shingles, and displaced ridge caps per address. That gives the morning-after bulletin a severity sort built on per-address imagery, delivered as a numbered memo before the first adjuster gets dispatched.

If your next bulletin needs more than a footprint to work with, that's worth a look before the first truck rolls.

Start a project